Minutes of Power in 9.1.0 meeting
Greg Smith
gregsmitholpc at gmail.com
Fri Dec 12 14:09:59 EST 2008
Hi Chris, Joe, Paul and Richard,
How are we doing on closing these action items?
> * Chris to make some additions to requirement linking in the existing
> documentation, including what happens when the lid is closed.
>
> * Mitch and Deepak to figure out who works on requirement 12.
>
> * Joe to write test plan and get it reviewed.
>
> * Paul to write an explanation of what power button should do and update
> that requirement and specification.
>
> * Richard to determine how to address the no regressions requirement and
> how to measure the success of the feature in terms of Amps used.
I believe Joe is waiting for Chris to update the requirements before he
writes the test cases. I am waiting for the test cases so I can explain
to people exactly how much longer the battery will last.
Let's close these out so we can get this one ready early. Update the
feature page here:
http://wiki.laptop.org/go/Feature_roadmap/Improved_battery_life
BTW each feature no has its own page and all the features under
consideration are listed in a table here:
http://wiki.laptop.org/go/Feature_roadmap#All_features
Sort by "target 9.1.0" to see the must have list. Send me a note if you
think anything else needs to be on that must build in 9.1.0 list.
Other edits and added detail on any feature, welcome anytime.
Thanks,
Greg S
Greg Smith wrote:
> Greg, Chris, Joe, Erik, Mitch and Deepak met on Thursday 12/4.
>
> Minutes:
> Will use the feature roadmap for tracking:
> http://wiki.laptop.org/go/Feature_roadmap#Power_management
>
> We need to address the three separate high level areas on that page.
>
> We rewrote the requirement and listed all bugs and areas of work in the
> specification section. We integrated all of Gnu's comments (some must
> fix, some should fix and one should be moved to network).
>
> We wrote down who owns each of the listed requirements in the owners
> section.
>
> Action items:
> * Chris to make some additions to requirement linking in the existing
> documentation, including what happens when the lid is closed.
>
> * Mitch and Deepak to figure out who works on requirement 12.
>
> * Joe to write test plan and get it reviewed.
>
> * Paul to write an explanation of what power button should do and update
> that requirement and specification.
>
> * Richard to determine how to address the no regressions requirement and
> how to measure the success of the feature in terms of Amps used.
>
> Comments and questions welcome. I will check with you on status of your
> action items next week.
>
> Thanks,
>
> Greg S
>
>
>
>
>
More information about the Devel
mailing list