<div dir="ltr"><div class="gmail_extra"><div class="gmail_extra"><br></div><div class="gmail_extra">Thanks all for the outstanding amount of information. I think I will try a setup like so:</div><div class="gmail_extra"><br>
</div><div class="gmail_extra">UNISOLAR PVL 136 Watt 24V Panel</div><div class="gmail_extra">-></div><div class="gmail_extra">MPPT Tracer1210RN Solar Charge Controller Regulator 12/24V INPUT 10A</div><div class="gmail_extra">
-></div><div class="gmail_extra">12V lead-acid battery. Originally a small UPS battery, but hopefully getting something more serious when everything else works and the funds are there.</div><div class="gmail_extra">-></div>
<div class="gmail_extra">Directly to a bank of 5-10 XO 1s, using a charger squid/bank that I'm putting together myself.</div><div class="gmail_extra"><br></div><div class="gmail_extra">If I order the charge controller in the next 3 hours I can be sure that I will get it in time for my trip. Otherwise I'll have to fall back on my 12V controller. Please let me know—does this plan with the charge controller seem like a safe bet?</div>
<div class="gmail_extra"><br></div><div class="gmail_extra">Thanks!</div></div></div>